Project #1 Renewal of the storage area (part 3)

Here’s a update on the renewal of the storage area in our basement. Take a look at these pictures and see what’s going on.


Picture to the left: here’s the view down the stairway, the upper part of the wall is being painted today (hurray)
Picture to the right: the old window is still there (I’ll be going window shopping soon)


Picture to the left: the ceiling and walls in this part of the room is done and we’ve replaced the door (check)
Picture to the right: we discovered a humid hole in the floor, soon to be sealed


Picture to the left: the stairway will be the last area to be painted
Picture to the right: doing the job of adjusting the tiles

Read all about the starting point for the war on procrastination in part one, and for an overview of the plan for this area in part two of this series.